Friday, September 23, 2016

Recap--Conf Call 9/23

Our group made progress on the call last night.  Everyone was in favor of moving forward toward:
(1) Stage Reconfiguration (involving Jack / Carl) for estimates and who can do the work (permits, etc.)
(2) Stage flooring modifications (Dark Stain on Pergo or Parquet flooring) (Jack / Carl)
Phase 2:
(3) Drywall White Wall Hung / Cross reconfiguration - Wally.  White painted steel trellis hung from the ceiling.
(4) LCD Lighting for color and texture options - Wally, Gary S.
Plan sketches here.


Thursday, September 8, 2016

First Design Idea...

(Please keep in mind, this is a rendering & a rough idea of staging... Panels would have a stain to blend with other colors & is not exact to color...)  Major updates here include:
  • Re-carpet existing stage carpet in charcoal gray & painting current parquet floor (epoxy paint for durability).  This would mute the electronics, cords & music stands and create cohesion.
  • Introduce 4-6 freestanding, wood walls--with drop lighting.  This would create better sectioning, provide textural interest & could be re-purposed when major remodel is done (e.g. gym stage.)
  • Install drop lighting (Edison or modern style chands) to warm stage area
  • Potentially mount 2 50-inch flat screen TVs on each wall (provided we are gifted them.)
  • Optional: add a piece to stage to bring grand piano up
  • Remove organ (discard or place on Craigslist for pickup) & use that area for seasonal design, flag and/or banners
as a point of reference, this is the BEFORE:
  



Wednesday, September 7, 2016

Sister Church...with great ideas & design

I don't know much about this church, but some friends told me to check out Arlington Countryside Church - http://www.acchurch.org/home, as they just redid their sanctuary.
I would like to go visit & see (in person), what this looks like.  I like their style, and while I don't think we should go that contemporary--there are some elements we could easily incorporate.
Inline image 1